The callers in these two separate conversations both had concerns about water, but they were discussing different jobs. The first reported water entering at a window when the stucco became very wet. The second asked whether work during rainy conditions would mean removing all the wood at once.
The first call: deciding whether to address only the window
It's when the stucco gets really wet, then it starts leaking in behind and on into my window into the house.
The first caller wanted to address water entering the house. Chimney work was also under consideration, but the caller was thinking about postponing that work and having only the window addressed.
On the chimney stuff and probably just do the window.
Our response explained the proposed sequence for the repair under discussion. We would open the affected area, install paper, waterproof it and then plaster it. We were describing the proposed work, not confirming what had caused the reported leak.
Open them up, put the paper, waterproof them, and then plaster them.
The caller also asked whether work on the side of the house would require repainting afterward. We said the caller would need to have paint available and that we could roll it on. Our explanation connected painting with avoiding different colors. The caller confirmed that the house was already painted.
Come out or do I have to repaint it after you do that.
You don't have different colors.
The second call: explaining sectional work during rain
The second caller asked whether all the wood would be removed. We explained that, for this job during rainy conditions, we would open sections rather than open everything at once.
No, pero pues acuérdate que va a quitar toda la madera, ¿No?
No, no, lo hago en secciones todo, cuando es tiempo de lluvia se hace todo en secciones para que no se moje.
Our explanation described how that sectional work would proceed. We would install the windows in the section being worked on before covering that section with paper and metal. The stated purpose of that sequence was to limit rain exposure.
Ya ve que tiene una ventana, se mete la ventana y se tapa con papel y metal, queda ya listo pues si hago la mitad de la casa, le meto las ventanas y la tapo de una vez para que no se moje.
Our answers concerned two different jobs. The first call covered whether to prioritize the window and leave chimney work for later, with painting discussed separately. The second covered the proposed work sequence during rain. We described a sectional approach for that job, not a repair choice for the first caller.
You can discuss a reported window leak with us, ask about related painting or ask how sectional work is proposed during rainy conditions.